Five steps with one team. A home takes 8 to 12 weeks from design approval to handover; larger projects take 14 to 20.
Consult
We meet at the studio or on site, walk the space and talk through how you live, the scope and the budget.
You leave with: a written scope and a budget band
Concept
A first layout and the sample board: real timber, stone, fabric, paint and metal you can hold and change.
You leave with: a layout and a physical sample board


The Bangsar board, and the room it becameRM 180,000 – 220,000
Design
3D views, working drawings and a full specification, with an itemised quotation you can check line by line.
You leave with: drawings, 3D views and an itemised quote
Build
Our contractors build it under our site supervision, with a progress update every week.
You get: a weekly update with photos
Handover
A final walkthrough, a defects list closed out, the room styled, and the keys back to you.
You get: a 12-month workmanship warranty
Every handover carries a 12-month workmanship warranty.
It covers structural and installation defects for a full year, and we chase the manufacturer warranties for you in that time.
Questions we hear
How long does an interior design project take?
A standard home takes 8 to 12 weeks from design approval to handover. Larger projects and full renovations take 14 to 20 weeks. You get a written timeline at the consult.
What budget should I plan for?
A condo renovation usually starts from RM 50,000 and a landed house from RM 150,000. Our recent projects ran from RM 45,000 for a bathroom to RM 400,000 for an office.
What materials and brands do you use?
We source flooring, cabinetry, sanitary ware and lighting from Malaysian and international suppliers, and every material on your sample board carries its maker's warranty.
Is there a warranty on the work?
Yes. Every project carries a 12-month workmanship warranty covering structural and installation defects, and we handle manufacturer warranty claims for you in that year.